
Harrison Food Building
Now Selling26 of 43 units leftabout 6 min walk (460 m) to Tai Seng MRT
Starting price
From $3.3xxM
$1,9xx psf
- District
- D13Macpherson / Potong Pasir
- Tenure
- Freehold
- Units
- 43
- Expected TOP
- 1Q 2027
- Developer
- Powermatics DataPowermatics Data Systems Ltd
Data updated 22 Nov 2026
26 units left
of 43 units · 40% sold since launch
No units sold in the past week.
Synced from developer sales data every morning, last on 22 Nov 2026.
- Factory26 of 43 left
Project timeline
Aug 2024
Launched
Booking day: the developer released the first units for sale.
TodayYou are here
Units on sale
Availability on this page syncs from developer sales data every morning.
1Q 2027
Expected TOP
The developer's estimated TOP. Timelines can move; we track the official date.
Aaron's research
Why Harrison Food Building stands out
My assessment of Harrison Food Building
Harrison Food Building is best assessed from the inside of a food business's operating plan. A unit can be generous on paper yet unsuitable once storage, preparation, cooking, cooling, packing and staff facilities are allocated. Ask the intended operator or a qualified food-premises consultant to test the proposed layout before selecting a unit.
Receiving and dispatch deserve equal attention. Confirm which vehicles can reach the chosen floor, how unloading takes place, and whether the delivery pattern conflicts with other users at busy times. Trace the routes for ingredients, finished food and waste separately. A building-wide ramp-up feature does not establish the capacity of each unit's loading arrangements or remove the need for operating rules.
Layout, access and ownership costs
Technical due diligence should cover the services that the actual process needs. Request the approved provisions for exhaust, drainage, grease management, power, gas where relevant, and cold-room or refrigeration equipment. Establish what is supplied by the developer and what the buyer must install. A marketing description of a food factory is not itself a licence to run a particular activity.
Timing is another material decision. The July 2026 topping-out announcement confirms a construction milestone, not the ability to occupy immediately. A relocation plan should distinguish building delivery from the time required for fit-out, testing and business approvals, while allowing for overlap with the existing premises.
The investment case should also remain grounded in these practical constraints. A potential tenant pool depends on the unit's approved uses, cost and configuration, not simply the size of Singapore's food sector. Evaluate the premises on present-day operating needs. Paya Lebar Air Base's eventual relocation is a long-term planning context, not a dated guarantee of stronger rents or demand for this particular building.
Compare your shortlist
For another option to assess, see CT Gold @ Macpherson. Compare the specific property, total budget and intended use; the two developments may differ in tenure, scale and delivery timing.
Food-production focus
The scheme is designed around food-factory premises rather than generic commercial space. Assess the technical fit for the intended process, not just the floor area.
Vehicular access
Powermatic describes direct vehicle access to each level. Verify the selected unit’s loading arrangements and vehicle limits before building a logistics plan.
Documented construction milestone
A developer announcement records topping-out in July 2026. Buyers can use that as a dated progress reference while obtaining separate confirmation of delivery and operating readiness.
Floor plans and units left
Availability per plan is as of the last morning sync. Prices come with the price list: get it here.
Tai Seng MRT is 460 m away in a straight line.
- Tai Seng MRTCC6 min460 m
- Bartley Secondary School7 min570 m
- SPACE NOVANow Selling910 m
- Mattar MRTDT11 min910 m
- Bartley MRTCC12 min940 m
- Canossa Catholic Primary SchoolWithin 1 km12 min960 m
- Cedar Primary SchoolWithin 1 km12 min960 m
- Generations @ TanneryFully sold1.1 km
- MacPherson MRTCCDT14 min1.1 km
- Cedar Girls' Secondary School14 min1.2 km
- Gourmet XchangeNow Selling1.4 km
- St. Gabriel's Secondary School20 min1.6 km
- Woodleigh MRTNE20 min1.6 km
- Paya Lebar Methodist Girls' School (Primary)1 to 2 km20 min1.6 km
- Potong Pasir MRTNE21 min1.7 km
- Ubi MRTDT22 min1.8 km
- Paya Lebar Methodist Girls' School (Secondary)22 min1.8 km
- Geylang Methodist School (Primary)1 to 2 km24 min1.9 km
- Geylang Methodist School (Secondary)24 min1.9 km
MRT Primary school Secondary and tertiary Nearby launchRings at 500 m, 1 km and 2 km. Walk times are estimates from the straight-line distance at 80 m a minute.
Distances are straight-line from the site pin. Walk times assume 80 m a minute, so the real route is usually longer. The school bands are a guide only: MOE measures Primary One distance from each home address with its own method, so check the exact address before you rely on a band.
Compare similar projects
The closest launches to Harrison Food Building, each tracked the same way. Use Change to compare any other project.
| Project | Harrison Food BuildingThis pageD13 - Macpherson / Potong Pasir | SPACE NOVAD19 - Hougang / Punggol / SengkangView project | Generations @ TanneryD13 - Macpherson / Potong PasirView project |
|---|---|---|---|
| Tenure | Freehold | Freehold | Freehold |
| Units | 43 | 47 | 59 |
| MRT | Tai Seng MRT, about 6 min walk (460 m) | Bartley MRT, about 7 min walk (580 m) | Mattar MRT, about 6 min walk (460 m) |
| % sold | 40% | 85% | 100% |
| Sold in last 7 days | 0 | 0 | 0 |
| TOP | 1Q 2027 | Q2 2028 | Q1 2029 |
| From price | $3.3xxM · $1,9xx psf | $2.6xxM · $1,6xx psf | Not out yet |
Units and sales come from each developer's sales data every morning; sold in the last 7 days needs a week of history. A row shows only when one project has the figure. From prices are partial; the full price list is sent on request.
Explore the development
Site plans, renders and maps. Click anything to enlarge it.
About Harrison Food Building
Harrison Food Building is a freehold food-factory development in Tai Seng by Powermatic Data Systems. The eight-storey scheme comprises 42 food-factory units and one ancillary industrial canteen. Its purpose is business production, making it a different proposition from an ordinary office, retail restaurant or residential investment.
The project is relevant to food manufacturers and central-kitchen operators assessing a purpose-designed location for their next operating base. Selection should begin with the production process: how ingredients arrive, where preparation and storage take place, and how finished products and waste leave the premises. The building's vehicle access is helpful only when the selected unit and its services support that workflow.
Structural topping-out took place on 22 July 2026. That milestone should not be read as confirmation of TOP, handover or readiness to begin food operations. Buyers should obtain a current completion update and allow for their own fit-out and approvals. This page focuses on the project's operating characteristics rather than speculative benefits from distant redevelopment plans.
The developer
Powermatics Data Systems Ltd
Powermatic Data Systems Limited is a Singapore-listed group whose corporate profile identifies Harrison Food Building as a property-development investment alongside its wireless-connectivity business. The project-specific vendor and contractual obligations should be confirmed in the sale documents.
Common questions
How many units does Harrison Food Building contain?
Powermatic’s July 2026 announcement states 42 food-factory units and one ancillary industrial canteen.
Does topping-out mean the building is ready for use?
No. Structural topping-out is not the same as TOP, handover or permission to begin a food business.
How should I plan a food-business relocation?
Allow time for building handover, fitting out, equipment testing and the required operational approvals. Compare the full timeline with the end date of the existing premises lease.
What should a food operator check first?
Confirm the intended activity, unit layout, service capacities, delivery arrangements and the approvals needed for the business and fit-out.
Get the price list and this week's balance units
Prices are not published on this page. Tell Aaron what you need and he sends it back, usually within the hour during the day.
- The current price list, unit by unit
- This week's balance-unit chart
- Floor plans for the types you shortlist
- A priority showflat slot
- Aaron's honest read on value before you commit
Aaron Ban · CEA R061593I · ERA Realty Network Pte Ltd
Now Selling status and unit counts come from developer sales data and can change without notice. Renders, site plans and floor plans belong to the developer and are indicative. Nothing on this page is an offer to sell. Verify details at the showflat before committing.